TECUMSEH LOCAL – ATHLETIC FACILITY
WDC Group served as the architect for the new athletic facility. This project included the construction of three new concrete masonry buildings beneath the 3000 new home side football stadium bleachers, totaling over 2800 square feet o space for restrooms, storage and concession space. A new press box was also installed on the home side and additional 1419 seats were installed on the visitor’s side of field. Construction included site work, removal of existing bleachers, site work including installation of storm drains, foundation and concrete slab work, as well as plumbing, mechanical, and electrical work for the restrooms and concession areas. The total project budget was $1.2 million.