STALLING FACILITY FOR THE WYOMING STATE FAIR


WDC Group provided architectural services from conceptual design through construction administration for a new stalling facility at the Wyoming State Fair and Rodeo. WDC also provided a review of the Master Plan and proposed siting as well as the original concept for the stalling building. The area involved totals an area of 160,000 SF and includes the 70,000 square foot facility and a potential arena area. The project was completed for $5.5 million.